Retirement Date Vintage Project Account Standard Project Type Retirement Quantity Measurement Type Details
10 Dec 20152013Balikesir 142.5 MW Wind Power Plant ProjectClimate Friendly CY2015 GoldPower SalesGold StandardWind11VER (tCO2e)UNIT View

Serial No.: GS1-1-TR-GS971-12-2013-2912-234138 to 234148

GoldPower for Electricity Consumption: 20151106 #00013523 51.6MWh

13 Dec 20152013Balikesir 142.5 MW Wind Power Plant ProjectClimate Friendly CY2015 GoldPower SalesGold StandardWind7VER (tCO2e)UNIT View

Serial No.: GS1-1-TR-GS971-12-2013-2912-234149 to 234155

Adjustment: GoldPower for Electricity Consumption: 20151106 #00013523 51.6MWh

14 Dec 20152013Balikesir 142.5 MW Wind Power Plant ProjectClimate Friendly CY2015 GoldPower SalesGold StandardWind14VER (tCO2e)UNIT View

Serial No.: GS1-1-TR-GS971-12-2013-2912-128284 to 128297

Adjustment GoldPower for Electricity Consumption: 20151106 #00013523 51.6MWh

Please note this is not a complete listing of all Retired Credits, but only those that public account holder have requested to be publicly available.

Retirement of a unit does not necessarily constitute the offsetting of an environmental impact. Where a unit is 'retired' on the Registry, it is being taken out of circulation in the marketplace so that any Environmental Benefit that may underpin that unit cannot be dealt with again.

A PIU represents the anticipated Environmental Benefits that are expected to be generated from a project in the future. A PIU does not represent an actual Environmental Benefit. Once the Environmental Benefit has occurred (e.g. the emission reduction or removal from a project) and has been verified in accordance with the relevant Standard, the PIU will be cancelled and an equivalent Unit will be issued under the Standard against which the project is validated and verified. Where a PIU has been sold to another party, the PIU will be listed in the account of the new owner based on a contract between the seller and the new owner which has been seen by Markit. However, Markit provides no assurance or guarantee that any PIU will be converted to a Unit and simply evidences the facts that such rights are anticipated and under contract may have been assigned to a third party.
For more information about Markit, please contact us at any of our regional offices
Copyright © 2017  Markit Group Limited. ALL DATA PROVIDED AS IS, WITH NO WARRANTIES. All rights reserved.
Data may not be reproduced or redistributed in any form, except as expressly authorized by Markit Group Limited.