Registry - Public View


Retirement Date Vintage Project Account Beneficial Owner Standard Project Type Retirement Quantity Measurement Type Details
05 Feb 20182016Honiton Energy Bailingmiao Phase Two Windfarm ProjectSouth Pole Carbon Asset Management Ltd. Gold StandardWind156VER (tCO2e)UNIT View

Serial No.: GS1-1-CN-GS505-12-2016-6007-2838 to 2993

164 MWhs of GoldPower for Interface Floor China: Energy consumption for a portion of its 2018 electricity use.

09 Feb 20172015Honiton Energy Bailingmiao Phase Two Windfarm ProjectSouth Pole Carbon Asset Management Ltd. Gold StandardWind2,566VER (tCO2e)UNIT View

Serial No.: GS1-1-CN-GS505-12-2015-4717-43948 to 46513

2'944MWh of GoldPower for Interface Floor China: Energy consumption 1/1/2016 - 31/12/2016

09 Feb 20172015Honiton Energy Bailingmiao Phase Two Windfarm ProjectSouth Pole Carbon Asset Management Ltd. Gold StandardWind232VER (tCO2e)UNIT View

Serial No.: GS1-1-CN-GS505-12-2015-4717-46514 to 46745

2'944MWh of GoldPower for Interface Floor China: Energy consumption 1/1/2016 - 31/12/2016

05 Feb 20182016Honiton Energy Bailingmiao Phase Two Windfarm ProjectSouth Pole Carbon Asset Management Ltd. Gold StandardWind2,837VER (tCO2e)UNIT View

Serial No.: GS1-1-CN-GS505-12-2016-6007-1 to 2837

2,985 MWh of GoldPower for Interface Floor China: Energy consumption 1/1/2017 - 31/12/2017

Retirement of a unit: The permanent removal of a credit from circulation in the registry system.

For more information about Markit, please contact us at any of our regional offices
Copyright © 2018  Markit Group Limited. ALL DATA PROVIDED AS IS, WITH NO WARRANTIES. All rights reserved.
Data may not be reproduced or redistributed in any form, except as expressly authorized by Markit Group Limited.